Profits USA

(650) 449-6888 --- info@ProfitsUSA.com

  • Home
  • TPR
  • AI Developer
  • IRC 179D-45L-48
  • No-Cost Solar/EV Chargers
  • About us
  • Privacy Policy
  • More
    • Home
    • TPR
    • AI Developer
    • IRC 179D-45L-48
    • No-Cost Solar/EV Chargers
    • About us
    • Privacy Policy
Profits USA

(650) 449-6888 --- info@ProfitsUSA.com

  • Home
  • TPR
  • AI Developer
  • IRC 179D-45L-48
  • No-Cost Solar/EV Chargers
  • About us
  • Privacy Policy

“No-Cost” Solar / EV Chargers with 50-50 Revenue Share

Your 4 Benefits

  1. Lower utility bills, increase revenue, property value, and appeal. 
  2. Truly free. All design, installation, operation, maintenance, & warranty are covered.
  3. An established US energy company will design and install “no-cost” Solar Farms, Solar Roofs, Solar Carports, Battery Storage, and EV vehicle Fast Charging Stations and give you a 50-50 revenue share.
  4. Tenants/clients/employees/community will appreciate renewable energy

EV Chargers: Universal, Fast, and Revenue-Generating

  1. Universal Compatibility: Works with all EV vehicles.
  2. - Fast Charging: Charges vehicles in 20-30 minutes.
  3. - Space Requirements: Minimum of 2 stations (4 parking spaces total).
  4. - 10-year warranty: Covers installation, equipment, maintenance, and electricity.

Solar: Cost Savings & Durable Infrastructure

  • Energy Savings: Solar will offset energy costs, and reduce utility bills.
  • Long-Lasting Panels: 30-year warranty; designed to withstand high winds/hail.

3 Solar Options:

  1. Solar Carports: Renewable energy with shaded parking.
  2. Rooftop Solar: For building roofs over 10,000 sq. ft.
  3. Solar Field: Minimum 1.5 acres, creates up to 1 MW (1,000 homes).

No-Cost, No-Obligation Evaluation

Your property will be evaluated for the optimal number of solar panels and EV fast chargers. This takes about 90 days, after you which will receive a JV power purchase agreement (PPA) proposal with 50-50 revenue share for review and your signature. The Energy company handles everything from then on.

Relocation No Effort/Time or Check Required

Only three things are necessary to submit your property for evaluation: address, name of owning entity, and decision maker's contact information. Your only further involvement will be reviewing the JV power purchase agreement (PPA) and your signature.

1-page Overview PDF

Download PDF

Copyright © 2024 Profits USA - All Rights Reserved.

info@ProfitsUSA.com Tel (650) 449-6888 


Our two free eBooks total over 800 pages: ProfitsUSA.com, GeniusPaymentSystem.com  

 For over twenty-five years, our elite due diligence community of Attorneys, CPAs, industry experts, and software companies have done Due Diligence on America's best-in-class profit-enhancing,  cost, and risk-saving solutions.


No mobile information will be shared with third parties/affiliates for marketing/promotional purposes. All the above categories exclude text messaging originator opt-in data and consent; this information will not be shared with any third parties.


This reading material is presented with the understanding and agreement thatProfits USA is not engaged in rendering legal or other professional services by posting said material. US Treasury regulations require us to inform you that any US federal tax advice contained herein is not intended or written to be used and cannot be used by any person or entity to avoid penalties that may be imposed under the Internal Revenue Code. The services of a competent professional should be used if legal or tax assistance is required. 

  • 1031 Alternative
  • Investment Tax Credit
  • Energy Progress
  • 2024 Dem Platform
  • $3.5 Billion in Savings
  • Healthcare Savings
  • About us
  • Loans
  • Cost Seg

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

Accept